Electrical Supplies and Lighting
3.1 The organizer will provide general lighting in the exhibition hall
during show time only.
3.2 The electrical power in the hall required 220 volt
3.3
A Plus Utility Management Co., Ltd. is the official electrical supplier who is in charge of every electrical installation.
3.4 Electrical supply will be available about 30 minutes before and after the show time. If exhibitors require 24 hours electrical supply or additional electrical equipment, then
Form 9 must be filled out and sent directly to
A Plus Utility Management Co., Ltd. before
4 September 2009.
3.5 Exhibitor(s) are not permitted to perform any electrical connection to the main power supply of the exhibition hall without consulting the official electrical contractor.
If there is any electrical connection/modification or using multiple sockets without permission, the electrical supply will be cut without any warning.
The organizer reserves the right to cut power supply to any booth in case of improper usage of electrical equipment or other dangerous conducts.